(Solution) 11-12. Madison Manufacturing Is Considering A New Machine That Costs $350,000 And Would Reduce Pre-tax Manufacturing Costs By $110,000 Annually. | Snapessays.com


(Solution) 11-12. Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually.


11-12. Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS method to depreciate the machine, and management thinks the machine would have a value of $33,000 at the end of its 5-year operating life. The applicable depreciation rates are 33.33%, 44.45%, 14.81%, and 7.42%, as discussed in Appendix 11A. Working capital would increase by $35,000 initially, but it would be recovered at the end of the project's 5-year life. Madison's marginal tax rate is 40%, and a 10% WACC is appropriate for the project. a. Calculate the projects NPV, IRR, MIRR, and payback. b. Assume management is unsure about the $110,000 cost savings—this figure could deviate by as much as  plus or minus 20%. What would the NPV be under each of these extremes? c. Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine’s salvage value, and the working capital (WC) requirement. She asks you to use the following probabilities and values in the scenario analysis: Scenario Probability Cost Savings Salvage Value WC Worst case 0.35 $88,000 $28,000 $40,000 Base case 0.35 110,000 33,000 35,000 Best case 0.3 132,000 38,000 30,000 Calculate the project ’ s expected NPV, its standard deviation, and its coefficient of variation.  Would you recommend that the project be accepted?

 


Solution details:
STATUS
Answered
QUALITY
Approved
ANSWER RATING

This question was answered on: May 23, 2022

Solution~00021147601841.zip (25.37 KB)


This attachment is locked

Our expert Writers have done this assignment before, you can reorder for a fresh, original and plagiarism-free copy and it will be redone much faster (Deadline assured. Flexible pricing. TurnItIn Report provided)

Pay using PayPal (No PayPal account Required) or your credit card . All your purchases are securely protected by .
SiteLock

About this Question

STATUS

Answered

QUALITY

Approved

DATE ANSWERED

May 23, 2022

EXPERT

Tutor

ANSWER RATING

GET INSTANT HELP

We have top-notch tutors who can do your essay/homework for you at a reasonable cost and then you can simply use that essay as a template to build your own arguments.

You can also use these solutions:

  • ■ As a reference for in-depth understanding of the subject.
  • ■ As a source of ideas / reasoning for your own research (if properly referenced)
  • ■ For editing and paraphrasing.

This we believe is a better way of understanding a problem and makes use of the efficiency of time of the student.

Get Free Price Quote