(Solution) An automotive manufacturing engineer must choose between tow machines for replacement on the production floor. > Snapessays.com


(Solution) An automotive manufacturing engineer must choose between tow machines for replacement on the production floor.


An automotive manufacturing engineer must choose between tow machines for replacement

 

on the production floor.

 

Machine A Machine B

 

First cost, $ 25,000 16,000

 

Estimated salvage, $ 4,000 3,500

 

BTCF, $/year 5,000 3,500

 

Useful life, years 8 8

 

The machines have the 8-year estimated useful life and BTCF indicated; however, MACRS depreciation over a 5-year recovery period will be applied. An effective tax rate of 40% applies, and the after-tax MARR of 10% applies. Compare the two machines, using present worth after-tax analysis. Use the depreciation rates provided in Table 1

 

Table 1

 

MACRS Rates

 

Year Recovery Rates

 

1 0.2000

 

2 0.3200

 

3 0.1920

 

4 0.1152

 

5 0.1152

 

6 0.0576

 


Solution details:
STATUS
Answered
QUALITY
Approved
ANSWER RATING

This question was answered on: Sep 21, 2023

Solution~00021147637569.zip (25.37 KB)


This attachment is locked

Our expert Writers have done this assignment before, you can reorder for a fresh, original and plagiarism-free copy and it will be redone much faster (Deadline assured. Flexible pricing. TurnItIn Report provided)

Pay using PayPal (No PayPal account Required) or your credit card . All your purchases are securely protected by .
SiteLock

About this Question

STATUS

Answered

QUALITY

Approved

DATE ANSWERED

Sep 21, 2023

EXPERT

Tutor

ANSWER RATING

GET INSTANT HELP

We have top-notch tutors who can do your essay/homework for you at a reasonable cost and then you can simply use that essay as a template to build your own arguments.

You can also use these solutions:

  • ■ As a reference for in-depth understanding of the subject.
  • ■ As a source of ideas / reasoning for your own research (if properly referenced)
  • ■ For editing and paraphrasing.

This we believe is a better way of understanding a problem and makes use of the efficiency of time of the student.

Get Free Price Quote