(Solution) - In Problem 16 24 the current line has an operating cost -(2025 Original AI-Free Solution)
Paper Details
In Problem 16.24, the current line has an operating cost of $66.00/hr. The starting work part is a casting that costs $4.50/pc. Disposable tooling costs $1.25/pc. The proposed storage buffer will add $6.00/hr to the operating cost of the line. Does the improvement in production rate justify this $20 increase?